The True Cost of Upgrading to anUnvented Hot Water Cylinder
What the job costs, what adds to the price, what does not, and the honest answer on savings, for homes in Andover, Marlborough and Hungerford. Every figure on this page comes from the same model as the calculator on our unvented page, and every one excludes VAT.

Most of the cost guides you will find for unvented cylinders are national averages stitched together from lead-generation sites, and they end in ranges so wide they tell you nothing. This one is different in one way: every pound on it comes from the model behind the calculator on our unvented cylinder page, which is anchored on what Rosebourne has actually charged for this work. It is still a guide rather than a quote, because pipework and access differ from house to house, and the fixed price is confirmed in writing after a free survey.
About these figures. All prices exclude VAT (20%). The model adds a cylinder allowance by size to a day or two of labour and any extras the survey finds, and it allows roughly eight per cent either way for access and pipework. Ring Will on 01264 502027 for a current written price.
What This Guide Covers
- • What changes when you go unvented
- • The price by cylinder size, swap and conversion
- • A worked example with every line shown
- • What adds to the price, and what is quoted after survey
- • Hard water in our eight towns
- • The honest answer on running costs and savings
- • Grants and finance: what exists and what does not
- • Who should upgrade, and who should not
What Changes When You Go Unvented
A vented system
A cold water tank in the loft feeds a copper cylinder in the airing cupboard by gravity. The pressure at your taps is set by how far the tank sits above them, which is why an upstairs shower on a vented system is often weak and a bath takes an age to fill. The cylinder vents to the tank, so there is no stored pressure and no safety kit to speak of.

An unvented system
The cylinder is fed straight from the mains and stores hot water at mains pressure, so every outlet in the house gets the same strong flow and the loft tank goes. Because it holds pressure, it carries a set of safety devices by law: a pressure-reducing valve, an expansion vessel, a temperature and pressure relief valve and a tundish on a discharge pipe. That kit, and the G3 qualification needed to fit it, is where the extra cost sits.


Indirect: heated by a coil
Most cylinders in this area are indirect: the boiler or heat pump heats a coil inside the cylinder, and the coil heats the water. The brand of boiler does not restrict the brand of cylinder; the connections are standard.

Stainless steel or copper
Unvented cylinders are stainless steel, because the vessel has to hold pressure. The shell warranty is the maker's and varies from brand to brand (Megaflo gives 25 years on the shell); check the current terms when you choose.
What the Job Costs, by Cylinder Size
Two jobs, five sizes. A like-for-like swap replaces an unvented cylinder that is already there in 1 day. A conversion takes a vented system to unvented in 2 days, because the mains supply, discharge pipework and expansion vessel all have to be added. Every figure + VAT.
| Size | Suits | Cylinder and sundries | Like-for-like swap | Vented to unvented |
|---|---|---|---|---|
| 150 L | 1 bathroom, 1 to 2 people | £940 | £1,640 | £2,390 |
| 180 L | 1 bathroom, 2 to 3 people | £1,020 | £1,720 | £2,470 |
| 210 L | 1 to 2 bathrooms, 3 to 4 people | £1,150 | £1,850 | £2,600 |
| 250 L | 2 bathrooms, 4 to 5 people | £1,300 | £2,000 | £2,750 |
| 300 L | 2 to 3 bathrooms, 5 or more people | £1,450 | £2,150 | £2,900 |
Labour is £700 + VAT for a like-for-like swap (1 day) and £1,450 + VAT to convert (2 days). The cylinder column is our allowance for the unit, its safety kit and sundries at that size; we price by size, not by badge, and the survey confirms the exact unit. Heat-pump and thermal-store cylinders are quoted after survey because the model has no line for them.
A worked example: 210 L conversion, loft tank out, mains upgraded
An illustration from the calculator's model, not a named job: a three- or four-person house moving from a tank in the loft to a 210 L unvented cylinder, with the old tank removed and the incoming mains upgraded on the way.
- 210 L unvented cylinder, fittings and sundries£1,150
- Labour: convert from a vented (tank in the loft) system (2 days)£1,450
- Remove the old cold water tank from the loft£250
- Upgrade the incoming mains pipework to the cylinder£350
Survey range £2,944 to £3,456 + VAT, 2 days. The one real anchor behind the model is a 150 L unvented cylinder supplied and fitted in Great Bedwyn in September 2025 at £1,651 + VAT (£1,981 inc VAT).
What Adds to the Price, and What Is Quoted After Survey
Priced in the model
- Remove the old cold water tank from the loft£250 + VAT
- Upgrade the incoming mains pipework to the cylinder£350 + VAT
- Scald-safe blending valve on the hot outlet£120 + VAT
These are the three extras the survey most often finds. Each is a line on the quote, so you can see what it is for and leave it out if you would rather.
Quoted after survey
- Low mains pressure or flow. An unvented cylinder needs the mains to deliver. We measure both at the survey. If the supply will not carry it, we say so, because an unvented cylinder on a poor main is a worse shower than the one you have.
- Electrics for the immersion. A new circuit, consumer unit work or an RCD is a qualified electrician's job. We book the two visits together; the electrician issues the certificate and notifies Building Control for the electrical work.
- Moving the cylinder. A new position means new pipe runs and a route for the discharge pipe. Priced from the survey measurements, never from a table.
- Building work. Enlarging an airing cupboard or widening a doorway is a builder's job and we will tell you if the cylinder you want will not go in.
- Heat-pump and thermal-store cylinders. Different coils, different sizes, often part of a wider system. Quoted after survey.
Hard Water in Andover, Marlborough and Hungerford

Our towns sit on chalk, so the water is hard and scale builds on anything that heats it: the immersion element first, then the coil. The photograph is a cylinder we removed in this area. Scale does not stop an unvented cylinder working, but it shortens the life of the parts inside it and it is the reason the annual check matters.
- Aquabion conditioner fitted alongsideFrom £485 + VAT
- Salt water softener, new installFrom £1,750 + VAT
- Annual unvented service visitFrom £150 + VAT
Neither treatment is compulsory. Aquabion AG publishes its own lab figures for scale prevention; we report them as the maker's, not as a promise. Our Aquabion versus softener comparison goes through the choice.
Running Costs and Savings: the Honest Answer
You will read elsewhere that an unvented cylinder saves a particular sum a year or pays for itself in a particular number of years. We do not say that, because nobody has measured it on our installations and the figure depends entirely on what you are replacing, how much hot water your house uses and what you pay for energy. A number without those three things behind it is decoration.
What does change, and what you can check yourself:
- Standing heat loss. Every cylinder sold today has a published standing loss in kWh per 24 hours on its label and data sheet. A thirty-year-old copper cylinder with a thin jacket loses more than a new foam-insulated one of either type. Compare the maker's figure for the model you are offered; that is the only saving you can put a number on before fitting.
- Pressure and flow. Mains pressure at every outlet, the same upstairs as down, and no shower pump. That is the reason most people upgrade, and it is a thing you notice every morning rather than a line on a bill.
- The loft. No cold tank means no frozen-tank risk in winter, no tank overflow, and the space back.
- Maintenance. An unvented cylinder should have its safety devices checked once a year; a vented one has no such kit. Budget the standard visit (from £150 + VAT) for it.
Grants and Finance: What Exists and What Does Not
Rosebourne finance
None. We do not offer credit, interest-free or otherwise. You get a fixed price in writing before work starts and you pay on completion.
Government grants
There is no grant for a hot water cylinder on its own. The Boiler Upgrade Scheme pays towards a heat pump installation, and a heat-pump cylinder can be part of that system, but the grant is claimed by the heat pump installer under the scheme's rules. If a heat pump is in your plans, tell us at the survey and we fit a cylinder that will suit one.
Who Should Upgrade, and Who Should Not
Worth it when
- • You have two or more bathrooms and the pressure drops when both run
- • The upstairs shower is weak and you are considering a pump
- • The loft tank is in the way of a conversion, or you want the space
- • The old cylinder is leaking or scaled and has to go anyway
- • A heat pump is on the horizon and the cylinder needs to suit one
Not worth it when
- • The mains pressure or flow at your stop tap is poor and cannot be improved
- • You have a combi boiler and no cylinder at all; that is a different conversation
- • Your vented cylinder is sound and the only complaint is a single weak shower a pump would fix
- • You are selling within the year and want a return on it; buyers like it, nobody can promise a figure
How the Job Goes
Free survey, written price
Will measures mains pressure and flow, looks at the existing cylinder, the loft, the route for the discharge pipe and the electrics, and sizes the cylinder from how the house uses hot water. The fixed price follows in writing.

Installation: 1 day or 2 days
Drain down, old cylinder out, new one in with its safety kit, discharge pipe and tundish. A conversion adds the mains-pressure supply, the discharge pipework and the expansion vessel, which is why it is 2 days. Taking the old cold tank out of the loft is a separate line (£250 + VAT) and most people have it done on the same visit.

Commissioning and paperwork
Pressures set, every outlet tested, safety devices checked, Building Control notified and the commissioning certificate left with you, along with 12 months on the workmanship. The cylinder carries its own maker's warranty on top.
Unvented Cylinder Installation by Will Gaze
With 22+ years in the trade and unvented cylinders fitted across Andover, Marlborough and Hungerford, I price every job from the same model you see on this page and confirm it in writing before anything is ordered.
Priced plainly
- ✓ Written fixed price before work starts
- ✓ Every extra its own line
- ✓ All prices exclude VAT (20%)
Qualified for it
- ✓ G3 unvented qualified
- ✓ WaterSafe approved
- ✓ Building Control notified on every job
Local water, local houses
- ✓ Hard water is the norm here; we plan for it
- ✓ Based in Wootton Rivers near Marlborough
- ✓ Boiler work stays with your Gas Safe engineer
After the job
- ✓ 12-month workmanship guarantee
- ✓ Maker's warranty on the cylinder
- ✓ Annual safety check from £150 + VAT
Unvented Cylinder Cost FAQs
How much does it cost to upgrade from a vented to an unvented hot water cylinder?
Converting a vented, tank-in-the-loft system to an unvented cylinder, supplied and fitted by Rosebourne, runs from £2,390 + VAT for a 150 L cylinder to £2,900 + VAT for 300 L. £1,450 + VAT of that is 2 days of labour, because the job adds a mains-pressure supply, discharge pipework and an expansion vessel as well as the cylinder. Taking the old cold tank out of the loft is £250 + VAT on top and upgrading the incoming mains is £350 + VAT. The figures come from the same model as the calculator on our unvented page; the fixed price is confirmed in writing after a free survey.
What does a like-for-like unvented cylinder replacement cost?
Replacing an unvented cylinder that is already there, same position and mains already in place, runs from £1,640 + VAT (150 L) to £2,150 + VAT (300 L). £700 + VAT of that is 1 day of labour; the rest is the cylinder, its safety kit and sundries. Every price on this page excludes VAT.
Will an unvented cylinder save me money on my bills?
We do not quote a saving, because nobody has measured one on our installations and the honest answer depends on what you are replacing. A new cylinder of either type loses less heat than a thirty-year-old one, and the maker publishes the standing loss for each model so you can compare. What an unvented cylinder changes for certain is pressure and simplicity: mains-pressure hot water at every outlet, no tank in the loft, no pump needed for the shower.
Do I need a G3-qualified plumber to fit an unvented cylinder?
Yes, by law. An unvented cylinder stores hot water at mains pressure, so Building Regulations require it to be installed by someone holding the G3 qualification, and the installation has to be notified to Building Control. Will is G3 qualified, submits the notification and leaves you the commissioning certificate.
Does hard water in Andover, Marlborough and Hungerford add to the cost?
It can. Our water is hard, and scale shortens the life of any cylinder's immersion and coil. The two things worth pricing alongside the cylinder are an Aquabion conditioner (from £485 + VAT) or a salt water softener (from £1,750 + VAT). Neither is compulsory and the survey is where we talk about whether either is worth it for your house.
Are there grants or finance for a new hot water cylinder?
Rosebourne does not offer finance, and there is no government grant for a cylinder on its own. The Boiler Upgrade Scheme pays towards a heat pump installation, and a heat-pump cylinder can form part of that system, but the grant goes to the heat pump installer under the scheme rules, not to the cylinder. If you are planning a heat pump, say so at the survey and we fit a cylinder that suits one.
Ready to Upgrade Your Hot Water System?
Will, G3 qualified, fits unvented cylinders across Andover, Marlborough & Hungerford. Try the calculator, then book the free survey.
Unvented cylinder page and calculator →Related Hot Water Guides
Hot Water Cylinder Replacement Cost 2026
Like-for-like and conversion prices by size, with worked examples from the same model.
Read Full Guide →Complete Hot Water Cylinder Guide UK
Brands, vented versus unvented, heat pump cylinders and sizing.
Read Full Guide →Our Prices
The standard, priority and emergency minimums and how a fixed price is built.
See the pricing page →Ready to Upgrade to an Unvented Hot Water Cylinder?
A free survey, a fixed price in writing, and a G3-qualified plumber who answers his own phone.
Thinking about a new cylinder?
Get a guide price in 30 seconds
Unvented cylinders supplied and fitted from £1,640 + VAT by a G3-qualified plumber. Pick the size and job type, see a price range, no email needed.